HomeFlintshire › Extension Plans in Hawarden

Extension plans in Hawarden, from someone who grew up here.

Mike was raised in the village and learned every street on a paper round out of the local post office. Twenty-five years on he draws the extensions, handles the planning applications, and knows exactly which streets the conservation area boundary runs through.

⚡ Get an instant estimate 📋 Book a £60 site visit 💬 Free 15-min call first

He learned these streets on a paper round.

Born and raised in the village · 25 years drawing its extensions

Most people looking for extension plans in Hawarden are choosing between firms in Chester or Wrexham who'll drive over, take some measurements and drive back. Mike grew up here. He learned the layout of every street the hard way — delivering papers out of the local post office as a boy. Penarlâg on the signs, the fountain at the crossroads, the Glynne Arms, the long climb up towards the castle grounds.

That matters more than it sounds. Hawarden is not a straightforward place to extend a house. The village centre is a designated conservation area with numerous listed buildings inside it, and the land slopes north towards the Dee, which changes what a rear extension does to your neighbours' light and outlook.

Dated brick bungalow in Hawarden before dormer conversion
Before
The same Hawarden bungalow after conversion to a 1.5-storey home with rendered gable and new driveway
After

Bungalow Transformation — Braeside Avenue, Hawarden

A dated brick bungalow turned into a 1.5-storey family home: new gable, rooms brought into the roof, rendered upper storey, replacement windows and a re-formed frontage and driveway.

Flintshire refused the first application. Mike took the council's reasons, redrew it and resubmitted — approved five weeks later. This is the result.

What Hawarden's conservation area means for your extension.

This is the single biggest thing Hawarden homeowners get wrong. Welsh Permitted Development rules are generous — a single storey rear extension up to 4 metres on a detached house, or 3 metres on a semi or terrace, often needs no planning application at all. But Permitted Development rights are restricted inside a conservation area, and Hawarden village centre is one.

The catch is that the boundary isn't obvious from the street. Two houses that look identical, a few hundred yards apart, can have completely different rights — one extends with no application and no council fee, the other needs a full householder application designed to respect the character of the area. Mike checks which side of the line you're on before you commit a penny. If your house is listed, listed building consent is needed alongside planning.

The same applies to anything sitting close to Hawarden Castle and its parkland, which Flintshire's own planning policy treats as a heritage constraint.

Hawarden village

Conservation area, listed buildings, older estate stock and Victorian cottages. The most design-sensitive part of the community — and the part Mike knows best.

Ewloe

Separated from Hawarden by the playing fields. Mixed post-war and modern stock, usually with more generous Permitted Development scope.

Mancot

Largely post-war semis and estate housing — classic territory for rear kitchen extensions and garage conversions with no planning application needed.

Aston

Family housing running down towards the Dee. Level changes and boundary distances are the usual design questions here.

How the work runs.

You deal with one person from the first sketch to the approval — no juniors, no outsourcing. Applications go to Flintshire County Council, whose planning department Mike has worked with for 25 years, and the householder fee is £585 when permission is actually needed. The council works to an eight-week target from validation; allow ten to twelve weeks end to end once the survey and drawings are included. The estimator below is already set for Flintshire.

1 · Measured survey

Mike surveys your home himself — no juniors, no outsourcing. The £60 visit fee comes off your fee when you go ahead.

2 · Existing & proposed drawings

Scaled drawings of your home as it is and as it will be — the documents your planning application stands on.

3 · Planning application

Prepared, submitted and handled for you — or confirmation you don't need one under Permitted Development, which saves you the council fee entirely.

4 · Building regulation drawings

The technical pack — structure, insulation, fire safety, drainage — that building control approves and your builder prices from.

What extension plans cost.

Mike works to a fixed written fee, agreed before any work begins. Council fees are separate and paid directly — never through Mike.

ItemTypical costPaid to
Mike’s fee — single storey extension£750 – £1,400Mike (fixed, written)
Mike’s fee — two storey extension£950 – £1,800Mike (fixed, written)
Planning application (if required)£585 Wales / £548 CheshireYour council
Planning Portal service charge£149Planning Portal
Building control (approx.)£600 – £1,000Council / inspector

Or just use it right here ↓

Instant Estimate

What might the design & approvals stage cost?

Mike's fee plus the council fees for planning and building control — the full professional stage, before a builder is involved. No forms, no email, no obligation.

1 · Your project
2 · Your council
Mike's design fee Mike's fee£750 – £1,400
What's included — and why the range?

Mike's fee covers the complete professional package:

  • ✓ Measured survey of your home
  • ✓ Existing & proposed drawings
  • ✓ Planning application — prepared, submitted and handled (if needed)
  • ✓ Full building regulation drawings your builder prices from

Why the range? Every home is different. The lower end covers a straightforward project — a simple survey, standard drawings, no planning application needed. The higher end covers larger or more complex work — a full planning application, more detailed drawings, or structural design to coordinate.

Before any work begins, Mike gives you a detailed written fee proposal — so you know exactly what you're paying and what it covers. The number you agree is the number you pay.

Initial site visit Mike's fee£60 — deducted if you go ahead
How the £60 site visit works

The visit. Mike comes to your home, assesses your space and your plans, tells you whether you need planning permission, and gives you honest advice on what's possible and what it's likely to cost. The visit fee is £60.

Commission the work and it's free. If you go ahead, the full £60 is deducted from your agreed fee — so the visit effectively costs you nothing.

Work beyond the agreed scope. Anything over and above the written fee proposal — amendments after approval, planning appeals, project management — is charged separately at £60 per hour, always agreed with you first.

Planning application Council fee — not Mike's£585
What is this — and how do I pay it?

What it is. The fee your council charges to process a householder planning application — their planners assess your proposed extension against local and national planning policy before granting permission.

Why it's needed. Larger extensions, or ones outside the Permitted Development rules, legally need planning permission before work starts. Many smaller extensions don't need it at all — Mike will tell you which side you're on at your site visit.

How you pay. Paid directly to your council when the application is submitted — it never passes through Mike. The fee is set nationally: £585 in Wales (Flintshire, Denbighshire and Wrexham) and £548 in Cheshire West & Chester. Mike prepares, submits and handles the whole application as part of his fee. Applications go in online via the Planning Portal, which adds a £149 service charge for a householder application on top of the council fee.

Planning Portal service charge Portal fee — not Mike's£149
What is the Planning Portal?

What it is. The Planning Portal is the official national website where planning applications are submitted online to councils across England and Wales — it's how applications reach your council's planning department.

Why the charge. The Planning Portal is the official route applications take to your council, and it charges a service fee on any application whose council fee is over £100. Since 2026 that fee is banded by application type: Band 1 is £99 inc VAT and Band 2 is £149 inc VAT. A householder application to enlarge, improve or alter an existing dwelling — which is what an extension, loft or garage conversion is — sits in Band 2, so £149. It is charged per application submitted, so a project that goes to outline permission first and reserved matters afterwards pays it twice. You can check any application type against the Planning Portal’s published bands.

How you pay. Paid online at the point of submission, together with the council's planning fee. Mike prepares and submits the application through the Portal on your behalf — this charge just doesn't apply at all if your project is Permitted Development, because there's no application to submit.

Building control Council fee — not Mike's (approx.)£600 – £950
What is this — and how do I pay it?

What it is. Completely separate from planning — building control checks that the construction itself meets the Building Regulations: structure, insulation, fire safety, drainage. An inspector approves the technical drawings and visits the build at key stages.

Why it's needed. It's a legal requirement for extensions and conversions, even when no planning permission is needed. At the end you receive a completion certificate — which you'll need when you come to sell the house.

How you pay. Paid directly to the council's building control team or a private approved inspector — typically a plan charge when the drawings go in and an inspection charge when work starts. Charges vary by council and project size, which is why this line is approximate: Mike obtains an exact quote for you once the design is finalised. Not part of Mike's fee.

👆 Make your choices above — your estimate updates instantly
Mike's fee — based on your choices
£750 – £1,400
Estimated total including council & portal fees
£2,026 – £3,026

Design and approvals only. This is what it costs to get your project drawn and approved — it does not include your builder’s costs for the actual building work.

If your project turns out to be Permitted Development, £676 of this comes off — Mike checks for free at your site visit.

Read more about extension plans →

Guide figures only. The £60 site visit is not added to the total — it comes off Mike's fee when you commission the work. Council fees correct at July 2026; building control charges vary by council and project — full details in the FAQs. Mike confirms everything in a written fee proposal before any work begins.

Or have Mike email this estimate to you — no obligation.

✅ Sent — Mike will email your estimate today. No obligation.

Couldn't send just now — call Mike on 07703 786 460 or email [email protected].

You don't have to take that number on trust.

Every planning application Deeside Architectural Design submits goes onto the council's public register — under the practice name, with the decision attached, permanently. It's free to search and it isn't curated by us. What the register cannot show you is the other half of the work: the projects that qualified as Permitted Development, needed no application at all, and saved the client the council fee. Those leave no public trace. So the number below is the part you can check — not the whole of it. Before you decide whether the fee above is worth paying, go and read it.

165 applications

Submitted to Flintshire County Council under Deeside Architectural Design since 2010 — every one searchable, with its decision attached.

12 of 15 in Hawarden

Twelve of the fifteen applications submitted in the village were approved — several inside five weeks of validation, against the council's eight-week target.

Since 2010

Deeside Architectural Design Limited, incorporated January 2010, and 25 years of drawings behind it. Companies House no. 07128221.

Check it yourself

Open Flintshire's planning register, put Deeside Architectural in the Agent field, and read every decision — including the ones that didn't go our way.

Search Flintshire's planning register →

Figures taken from Flintshire County Council's public planning register, August 2026.

Questions people ask.

Do I need planning permission for an extension in Hawarden?

Often not — but Hawarden is a place where it genuinely depends. Welsh Permitted Development rules cover many single storey rear extensions with no application at all. Inside the village conservation area those rights are restricted, and the boundary isn't obvious from the street. Mike checks which side of it you're on at the site visit, before any council fee is committed.

My house is in the conservation area — can I still extend?

Yes, in almost all cases. It means a full householder application rather than Permitted Development, and a design that answers to the character of the area from the outset — materials, proportions, how it reads from the street. That's a design question, not a refusal.

Have you ever had an application refused?

Yes — and anyone who tells you they haven't either hasn't submitted many or isn't being straight with you. Refusals are a normal part of planning, and every one of ours is on the public register for anyone to read. What matters is what happens next. A refusal arrives with the council's reasons attached, and most of the time those reasons are fixable — a roof line dropped, a window moved, a material changed. Mike talks to the case officer, amends the drawings and resubmits. The bungalow above was refused, redrawn and approved five weeks later.

How much do extension plans cost in Hawarden?

Extension plans from £750, loft conversion plans from £950, always as a fixed written fee agreed before any work starts. Flintshire's £585 householder fee plus the £149 Planning Portal charge are separate, paid directly, and only apply when permission is genuinely needed.

Does growing up in the village actually make a difference?

Honestly — for the drawings themselves, no. A competent designer produces the same technical pack wherever they're based. Where it counts is judgement: knowing the conservation area boundary, how the land falls towards the Dee, what Flintshire's case officers have accepted on similar streets, and being ten minutes away when something needs looking at rather than half a day.

Start with a number, not a commitment.

Two taps on the estimator gives you a realistic figure. When you're ready, the £60 site visit comes off your fee if you go ahead.

⚡ Instant estimate Book the site visit
📞 Call Mike ⚡ Estimate Book visit